http://www.brr.com.au/asx/PDZ/ on Boardroomradio.com

Latest News

Broadcast: 27 November 2008

Boardroom Radio Presentation - 2008 AGM Summary

Prairie Downs Metals Limited (PDZ) provides the opportunity to listen to an audio broadcast with Mr Alec Pismiris, Executive Director, Company Secretary in a presentation titled "PDZ - 2008 AGM Summary - Mr Alec Pismiris, Executive Director, Company Secretary".

 
ASX Release: 25 November 2008

Annual General Meeting

In accordance with Listing Rule 3.13.2 the directors advise that the resolutions put to shareholders were carried at the Annual General Meeting of the Company held earlier today.

 
ASX Release: 25 November 2008

Exploration Update

The directors of Prairie Downs Metals Limited ("Prairie" or "the Company") are pleased to provide an update on the current exploration activities being undertaken at the Prairie Downs Base Metal Project ("Project").

 
ASX Release: 21 November 2008

Appointment of Director

Prairie Downs Metals Limited ("the Company") is pleased to announce the appointment of Mr Stuart Hall as a non-executive director of the Company.

 
Media: 11 November 2008

"Long-Term, Prairie Downs Has Exciting Potential In Vanadium; Short-Term It's A Good Job That Mine Development Work Is On Hold"

Click through to read the full article featured on minesite.com, 11 November 2008.

 
ASX Release: 31 October 2008

Quarterly Report for the period ended 30 September 2008

The directors of Prairie Downs Metals Limited are pleased to provide the Quarterly Report for the period ended 30 September 2008.

ASX Release: 22 August 2008

Exploration Update - Prairie Downs Base Metals Project

Resource Drilling

On 1 August 2008 the Company announced the cessation of the first drill program at the Costean Seven copper/lead prospect. During this program a total of five holes were drilled, all of which were mineralised. Three out of the five holes did not reach the target depths due to drilling problems and a total of only 821 metres was drilled. 

A multi-purpose drill rig commenced operating on site on 2 August 2008 with the objective of targeting depth and strike extensions to the current 4.7 million tonne global zinc resource. In addition, a high grade mineral resource of 1.6 million tonnes grading 12.3%Zn, 3.7%Pb and 36.0 g/t Ag, has been estimated as referred to in the resource table below.

Conceptually the Company may extend high grade resources from 1.6 million tonnes to between 2.0 million tonnes and 2.5 million tonnes grading 8-12% zinc, 1-2% Pb and 10-20 g/t Ag. These potential resources are not estimated due to insufficient exploration to date but are suggested as possible on the basis of unclosed high grade mineralization, previous drilling to depth not included in the high grade resource due to low drill density, and a 3D geological interpretation. Current plant and mine design plans on this basis would support five years of high grade production and further facilitate financing negotiations. The potential quantity and grade is conceptual in nature, there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource.

A total of 16 RC holes for 2,517 meters have been drilled with target depths being achieved in three holes which intersected both alteration and sulphide mineralisation. All but three holes have reached target mineralization with the remainder of the holes requiring diamond tails to reach anticipated mineralized horizons. It is anticipated the multi-purpose drill rig will swap to diamond drilling late next week to reach target depths.

The mineralization encountered in the current drill program appears to confirm stacked Main and Zed lodes of broad thickness.

Assay results from the first drill program at the Costean Seven copper/lead prospect are expected to be available shortly. The Company anticipates the assay results from the current drill program should be available by the end of September 2008, however delays by the assay laboratory are possible. These results will be released as soon as they are processed.

On completion of the current program the Company will consider extending the current drilling program and drilling the various copper zones which include Costean Seven and Kerrs Find and cover a strike length of some 5 kilometres.


Resource Statement

In previous announcements the Company has referred the Project's total Global Resource of 4.7 million tonnes at a grade of 6.3% zinc, 18g/t silver and 1.8% lead at a nominal lower cut off grade of 1% zinc. The resource statement below has been updated to provide additional information on the classification of the Global Resources including the Indicated Resource and Inferred Resource for the respective lodes.

 

Lode

Category

Tonnes

Zinc

Lead

Silver

Zinc
Metal

Lead
Metal

Silver
Metal

     

(%)

(%)

(g/t)

(tonnes)

(tonnes)

(Ounces)

Main

Local Indicated

1,692,844

       7.8

      1.9

   23.8

132,086

32,164

1,295,725

Main

Local Inferred

853,838

       6.9

      1.9

   21.4

58,915

16,223

587,463

Main

Local Total

2,546,682

       7.5

      1.9

   23.0

191,001

48,387

1,883,188

Main

High Grade
Indicated

884,082

     13.3

      3.3

   34.8

117,193

29,526

989,823

Main

High Grade
Inferred

351,024

     11.3

      3.2

   46.0

39,666

11,233

519,141

Main

High Grade
Total

1,235,106

     12.7

      3.3

   38.0

156,858

40,758

1,508,964

                 

Zed

Local Indicated

477,352

       6.2

      2.6

   18.1

29,644

12,626

277,809

                 

Zed

Local Inferred

262,922

       5.9

      2.8

   15.0

15,512

7,362

126,797

Zed

Local Total

740,274

       6.1

      2.7

   17.0

45,157

19,987

404,606

Zed

High Grade
Indicated

144,562

     10.1

      6.0

   35.0

14,601

8,674

162,672

Zed

High Grade
Inferred

178,781

     10.0

      4.7

   35.0

17,878

8,787

201,178

Zed

High Grade
Total

323,343

     10.1

      5.4

   35.0

32,479

17,461

363,850

Gabbro

Local Indicated

87,639

     14.4

      2.9

   14.0

12,620

2,542

39,447

Gabbro

Local Inferred

1,280,463

       3.6

      1.0

     7.4

46,208

12,508

303,640

Gabbro

Local Total

1,368,102

       4.3

      1.1

     7.8

58,828

15,049

343,087

Gabbro

High Grade
Indicated

87,639

     14.4

      2.9

   14.0

12,620

2,542

39,447

Gabbro

High Grade
Inferred

-

-

-

-

-

-

Gabbro

High Grade
Total

87,639

     14.4

      2.9

   14.0

12,620

2,542

39,447

                 

Total Global

 

4,655,058

       6.3

      1.8

   18.0

294,986

83,423

2,630,881

Total Global
High Grade

 

1,646,088

     12.3

      3.7

   36.0

201,957

60,761

1,912,262

  

Corporate

The Company has commenced an executive search for a new Managing Director who will oversee the development and financing of the Project. The Company has previously indicated a desire to consider alternative project financing including joint venture arrangements with an end user or corporate partner, pre-payment from end user, off take with end users or traders, premium share issue tied to metal rights.

 

Alec Pismiris
Company Secretary

 

For further information contact:
Alec Pismiris
Company Secretary
+61 08 9225 5755

Information in this release that relates to Exploration Results or Mineral Resources is based on information compiled by Mr Luke Kerr who is a member of The Australasian Institute of Mining and Metallurgy. Mr Kerr has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Persons as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Kerr consents to the inclusion in this report of the statements based on their information in the form and context in which it appears.